Ecological road construction in Colombia

At the 15th Colombian Symposium for Road Construction in 2004 BAeR-Agentur für Bodenaushub GmbH was commissioned to produce a 80 m long and 6 m wide test road in Bogotá, Colombia.

Colombia initial state
Road in initial state
Colombia initial state
Road in final state

Through intensive research, it was found that due to the mineral rock deposits ecological binder TerraBas® could be produced locally and used within the ecoconvia.com®-process.

Ecological road construction in Zwickau, Dänkritzer Weg

In 2005 BAeR-Agentur für Bodenaushub GmbH was entrusted with the renovation of the road between Hartmannsdorf and Dänkritz. This route is frequently used by trucks, cars, cyclists and hikers.

Zwickau initial state
Road in initial state
Zwickau initial state
Road in final state

The initial state of the road was marked by potholes and cracks. Using cological road construction a 500 m long and 3 m wide section was produced. As ecological binder ÖkoBas® could be used for this project.